Infrastructure

  • Construction of Building is complete
  • Self-Financed
  • Land is on ownership basis

 

Specification of Rooms and other infrastructural facilities

Room No.

Description

      Length in meter

     Breadth in meter.

  Carpet area in sq. met.

      4

Class Room

7.50

6.45

48.30

      1

Multipurpose Hall

30.0

6.45

193.0

      1

Library Come Reading Room

16.15

8.5

123.83

      1

Principal Office

7.40

6.5

48.10

      1

Administrative Office

6.0

6.5

39.0

      1

Store Room

6.5

2.62

17.03

      1

Sports Store Room

6.5

5.90

38.350

      1

Girls Common Room

7.5

6.45

48.375

      1

Boys Common Room

7.75

6.5

50.375

      1

Art & Craft Room

7.7

6.45

49.665

     1

Music Room

7.7

6.45

49.665

     1

Socially Usefull Productive (SUPW ) Room

7.5

6.45

48.375

     1

Science Lab - 1

7.7

6.45

49.665

     1

Science Lab - 2

7.7

6.45

49.665

     1

Pscyology Lab

7.6

6.45

49.020

     1

Educational Technology (ET) / ICT Lab

7.6

6.5

49.4

     2

Any Other Room

15.35

6.5

99.775

     2

Toilet Girls

6.45

3.8

24.510

     2

Toilet Boys

6.45

3.65

23.543

     1

Director Room

7.40

6.5

48.10

     2

Staff Toilet (Female)

6.45

3.8

24.510

     2

Staff Toilet (Male)

6.45

3.65

23.543

     1

Parking Space

13

9

117

     2

Multipurpose Play Field

59

50

2090

 
 

 

 

Total Built up Area (in sq. meter)

2581.78

Total Built up Area (in sq.ft.)

27780

 

 

 

 

Infrastructure and also in facilities

Library

The Library has separate reference section Journals and reading room

Yes

Number of books in the library

 About 3058

Total number of Educational Journals/Periodicals being subscribed

Journals - 12

Number of encyclopedias available in the library

6

Number of titles in the library

1000

Seating capacity of the reading room of the library

50

 

 

Laboratories

Science Lab

Psychology Lab

Language Lab

Computer Lab

Educational Technology Lab